7.0 RATE-AG (AGRICULTURAL) Back
This tariff is applicable to motive power services used for irrigation purposes only.
7.1 The rates for following group are as under:
A1-HP TARIFF
7.1.1 HP Based Tariff:
|
For entire contracted load |
Rs.140/BHP/month |
ALTERNATIVELY
A2-PDC/RC METER TARIFF
7.1.2 Metered Tariff:
|
Fixed Charges |
Rs.10 per BHP per month |
|
Energy Charges: For entire consumption |
50 Paise per Unit per month |
A3-TATKAL METER TARIFF
7.1.3 Tatkal Scheme:
|
Fixed Charges |
Rs.10 per BHP per month |
|
Energy Charges: For entire consumption |
70 Paise per Unit per month |
NOTE:
The consumers under Tatkal Scheme shall be eligible for normal metered tariff as above, on completion of five years period from the date of commencement of supply.
7.2 No machinery other than pump for irrigation of water will be permitted under this tariff. Any other machinery connected in the installation governed under this tariff shall be charged separately at appropriate tariff for which consumers shall have to take separate connection.
A5-OPTIONAL METER TARIFF
|
Energy Charges: For entire consumption |
50 Paise per Unit per month |